1.1 OUVERTURE DE LA SÉANCE
2.1 ADOPTION DE L'ORDRE DU JOUR DE LA SÉANCE ORDINAIRE DU 20 AOÛT 2026
3.1 CONTRAT BALAYAGE DE RUE (MTQ) / PREMIER VERSEMENT
3.2 COMPENSATIONS TENANT LIEU DE TAXES
4.1 ADOPTION DU PROCÈS-VERBAL DE LA SÉANCE ORDINAIRE DU 9 JUILLET 2026
5.1 RAPPORT DES DÉPENSES DU MOIS ET AUTORISATION
5.2 EMBAUCHE D'UN ÉTUDIANT
5.3 RENOUVELLEMENT DU CONTRAT DE TRAVAIL DU DIRECTEUR GÉNÉRAL
5.4 AUTORISATION DE SIGNATURE / CONVENTION D'AIDE FINANCIÈRE POUR LA REVITALISATION DU SITE DE LA CHUTE SAULT-AU-MOUTON
5.5 OCTROI D'UN CONTRAT GRÉ À GRÉ / ÉQUIPE GT CONSTRUCTION POUR LA REVITALISATION DU SITE DE LA CHUTE SAULT-AU-MOUTON
5.6 ACCEPTATION D'UNE OFFRE D'ACHAT POUR LE LOT 6 137 352 SITUÉ DANS LE NOUVEAU DEVELOPPEMENT RÉSIDENTIEL
5.7 ACCEPTATION D'UNE OFFRE D'ACHAT POUR LE LOT 6 137 361 SITUÉ DANS LE NOUVEAU DEVELOPPEMENT RÉSIDENTIEL
6.1
7.1
8.1
9.1
10.1
11.1
12.1 AVIS DE MOTION ET ADOPTION DU PROJET DE RÈGLEMENT 26-07 MODIFIANT LE RÈGLEMENT 98-07 CORRESPONDANT AU PLAN D'URBANISME
12.2 AVIS DE MOTION ET ADOPTION DU PREMIER PROJET DE RÈGLEMENT 26-08 MODIFIANT LE RÈGLEMENT DE ZONAGE 98-09
13.1
14.1
15.1
16.1 PÉRIODE DE QUESTIONS
17.1 CLÔTURE ET LEVÉE DE LA SÉANCE